About Wireless Communications

Wireless For the Way We LiveWireless and SafetyWhen New Cell Sites Are Needed
How New Sites Are SelectedCell Sites to Fit Every Landscape
How New Sites Are Selected

Once T-Mobile determines that a new cell site is needed in a specific area to provide reliable coverage and handle call volume, an examination of the area is conducted. A T-Mobile team visits the area to identify feasible locations and potential sites are evaluated from the following perspectives to pinpoint the best location for the new site.

Scientific analysis: RF Engineers identify which location offers the best technical solution to address coverage gaps and wireless service needs.

Zoning and permitting: Zoning specialists ensure that all local zoning, permitting and building codes, plus all state and federal regulations, can be complied with at a location.

Real estate: Site acquisition specialists look for viable leasing arrangements, such as an amenable landlord and round-the-clock site access for technicians.

Construction: Construction managers ensure that the proposed site can be constructed safely and will meet all municipal building codes and safety standards.

Permitting and construction
Once a location that best meets all criteria is selected, T-Mobile conducts due diligence to confirm that the selected site is truly the best option—from scientific, zoning, leasing, construction and permitting perspectives. Then T-Mobile works with local officials to obtain all required permits and negotiates a lease with the property owner.

Once permits have been issued by all local, state and federal agencies, T-Mobile builds the facility, staying in close contact with the landlord and local building department through the construction process.